Architecture
Professional Practice Examination (PPE)
Professional practice examination for architects; on passing, the architect is entered onto the Standing Register of Registered Architects.
- Practice questions
- 203
- Flashcards
- 150
- Topics
- 15
- Mock exam
- 100 questions · 120 min · pass 50%
What the Professional Practice Examination (PPE) covers
Our questions are organised by subject and topic, following the exam syllabus.
Architectural Professional Practice
- Registration, Ethics & Client Duty 23 Qs · 16 cards
- Project Delivery & Contract Administration 24 Qs · 17 cards
- Planning, Building Control & Sustainability 21 Qs · 14 cards
- Practice Management & Fees 8 Qs · 6 cards
- Construction Law & Disputes 8 Qs · 6 cards
Construction & Project Management
- Project Management 13 Qs · 8 cards
- Contracts & Procurement 12 Qs · 8 cards
- Construction & Site Management 10 Qs · 7 cards
Architectural Design & Technology
- Climate-Responsive Design in Ghana 18 Qs · 15 cards
- Fire Safety & Accessibility 12 Qs · 8 cards
- Building Technology & Materials 16 Qs · 15 cards
- Site Analysis & Briefing 10 Qs · 8 cards
- Heritage, Urban Design & Housing 10 Qs · 7 cards
- Building Services & Sustainability 8 Qs · 6 cards
- Structures & Services Coordination 10 Qs · 9 cards
Sample Architecture practice questions
Try these 12 questions from different topics. Open "Show answer" to check yourself and read the explanation.
-
Question 1 · Registration, Ethics & Client Duty
A client asks a probationer architect to describe themselves publicly as a registered architect before passing the PPE. What is the most appropriate response?
- A.Decline and use only the professional title permitted by the current register
- B.Use the title because the client requested it
- C.Use the title only on social media
- D.Use the title if no fee is charged
Show answer
Answer: A. Decline and use only the professional title permitted by the current register
Protected professional titles and registration status should be represented accurately to clients and the public.
-
Question 2 · Project Delivery & Contract Administration
A client requests a material change during construction that may affect cost and completion time. What should the architect do first?
- A.Tell the contractor to proceed verbally without records
- B.Document and evaluate the proposed variation through the authorized contract process
- C.Hide the likely cost effect from the client
- D.Change the drawings after completion
Show answer
Answer: B. Document and evaluate the proposed variation through the authorized contract process
Controlled variation procedures preserve authority, scope, cost, time and accountability.
-
Question 3 · Planning, Building Control & Sustainability
Before construction begins on a project requiring statutory approval, what should the architect confirm?
- A.That furniture has already been purchased
- B.That the contractor can bypass the assembly
- C.That the required planning and building approvals have been obtained
- D.That only a verbal neighbourhood approval exists
Show answer
Answer: C. That the required planning and building approvals have been obtained
Professional project delivery includes compliance with applicable planning, building and environmental requirements.
-
Question 4 · Practice Management & Fees
An architect's fee of 6% on a construction cost of GH₵2,000,000 is:
- A.GH₵12,000
- B.GH₵1,200,000
- C.GH₵120,000
- D.GH₵60,000
Show answer
Answer: C. GH₵120,000
0.06 × 2,000,000.
-
Question 5 · Construction Law & Disputes
An architect who negligently designs a building that causes injury may be liable in:
- A.Tort (negligence) and possibly contract
- B.Criminal law only, never in civil law
- C.Customary law only
- D.No law at all
Show answer
Answer: A. Tort (negligence) and possibly contract
Liability may be owed to the client and to third parties.
-
Question 6 · Project Management
The critical path in a project network is the:
- A.Longest path, setting the minimum duration
- B.Shortest path through the network of activities
- C.Path with the most activities
- D.Path with the most resources
Show answer
Answer: A. Longest path, setting the minimum duration
Delays on critical activities delay the whole project.
-
Question 7 · Contracts & Procurement
FIDIC contracts are widely used for:
- A.Employment contracts for engineering staff
- B.International construction projects
- C.Land sales
- D.Insurance policies
Show answer
Answer: B. International construction projects
The Red Book is for construction designed by the employer.
-
Question 8 · Construction & Site Management
The standard age at which concrete cube strength is usually assessed for compliance is:
- A.3 days
- B.1 year
- C.28 days
- D.1 day
Show answer
Answer: C. 28 days
7-day results give an early indication.
-
Question 9 · Climate-Responsive Design in Ghana
In Ghana's tropical climate, buildings are best oriented with their long axis running:
- A.North–south, to face the rising and setting sun
- B.East–west
- C.Diagonally in every case
- D.Towards the nearest road only
Show answer
Answer: B. East–west
Low morning and afternoon sun on east and west walls is hard to shade.
-
Question 10 · Fire Safety & Accessibility
Fire safety certification of premises in Ghana is the responsibility of the:
- A.Architects Registration Council
- B.Ghana National Fire Service
- C.Ghana Police Service
- D.Environmental Protection Agency
Show answer
Answer: B. Ghana National Fire Service
The Fire Service operates under Act 537 (1997).
-
Question 11 · Building Technology & Materials
A damp-proof course in a wall mainly prevents:
- A.Termite attack on roof timbers
- B.Heat gain through the wall
- C.Sound transmission
- D.Rising damp from the ground
Show answer
Answer: D. Rising damp from the ground
It is laid near the base of walls above ground level.
-
Question 12 · Site Analysis & Briefing
A client brief for a building project mainly sets out:
- A.The contractor's tender price and programme for the works
- B.The architect's personal design preferences
- C.The client's needs, budget and timescale
- D.Building regulations in full
Show answer
Answer: C. The client's needs, budget and timescale
A clear brief reduces costly design changes later.
Sample flashcards
Quick facts to revise. Members can study every card with Learn, Test and Match modes.
- Registration body
- Architects Registration Council
- Architect's instruction
- In writing
- Planning law
- Act 925 (2016), LUSPA
- Fee calculation
- % × construction cost
- Negligent design
- Tort and contract liability
- Critical path
- Longest path, zero float
- FIDIC Red Book
- Employer-designed construction
- Concrete compliance age
- 28 days
Ready to practise the full Architecture question bank?
Free account. Practise by topic, sit timed mock exams, study flashcards and track your readiness.
Create a free accountStudyVib is an independent study platform and is not affiliated with or endorsed by the Architects Registration Council. Questions are original practice material written to reflect the syllabus; they are not past examination papers.