What the Engineering Professional Examination (EPE) covers
Our questions are organised by subject and topic, following the exam syllabus.
Professional Engineering Practice
- Ethics, Competence & Public Safety 14 Qs · 7 cards
- Risk & Project Controls 11 Qs · 7 cards
- Professional Review & Quality 13 Qs · 9 cards
- Engineering Regulation in Ghana 10 Qs · 6 cards
- Occupational Health & Safety 12 Qs · 9 cards
- Professional Scenarios 10 Qs · 7 cards
Engineering Management
- Engineering Project Management 13 Qs · 8 cards
- Engineering Economics 12 Qs · 8 cards
- Contracts & Procurement 12 Qs · 8 cards
- Environment & Sustainability 10 Qs · 7 cards
- Engineering Law & Communication 10 Qs · 7 cards
- Asset Management & Maintenance 10 Qs · 6 cards
- Digital Engineering & Innovation 8 Qs · 5 cards
Engineering Fundamentals
- Engineering Science Fundamentals 12 Qs · 9 cards
- Construction & Site Management 10 Qs · 7 cards
- Leadership & Engineering Teams 6 Qs · 4 cards
- Ghana Infrastructure & Utilities 6 Qs · 6 cards
- Engineering Design Process 10 Qs · 6 cards
- Measurement & Engineering Statistics 14 Qs · 8 cards
Sample Engineering practice questions
Try these 12 questions from different topics. Open "Show answer" to check yourself and read the explanation.
-
Question 1 · Ethics, Competence & Public Safety
An engineer discovers that a proposed design creates an unacceptable public-safety risk. What should they do?
- A.Approve it to avoid delay
- B.Delete the calculation
- C.Document and escalate the risk and withhold approval until it is adequately controlled
- D.Discuss it only after construction fails
Show answer
Answer: C. Document and escalate the risk and withhold approval until it is adequately controlled
The Engineering Council code places public safety, integrity and competent practice at the centre of professional duty.
-
Question 2 · Risk & Project Controls
What is the primary purpose of an engineering risk assessment?
- A.Guarantee that no uncertainty exists
- B.Replace competent design review
- C.Record only incidents that already caused injury
- D.Identify hazards, evaluate risk and select effective controls before harm occurs
Show answer
Answer: D. Identify hazards, evaluate risk and select effective controls before harm occurs
Risk assessment supports preventive decisions by linking hazards, consequences, likelihood and controls.
-
Question 3 · Professional Review & Quality
A calculation affecting structural safety was prepared by a junior engineer. What is the appropriate quality-control action?
- A.Have it independently checked by a competent person before approval
- B.Approve it based on file name
- C.Remove the assumptions from the record
- D.Ask the client to accept all technical risk
Show answer
Answer: A. Have it independently checked by a competent person before approval
Competent verification provides a barrier against calculation, assumption and transcription errors.
-
Question 4 · Engineering Regulation in Ghana
The statutory body that regulates engineering practice and registers engineers in Ghana is the:
- A.Engineering Council, established under Act 819 (2011)
- B.Ghana Institution of Engineering acting under the Companies Act
- C.Ghana Standards Authority
- D.Ministry of Works and Housing
Show answer
Answer: A. Engineering Council, established under Act 819 (2011)
GhIE is the professional learned society; the Engineering Council is the regulator.
-
Question 5 · Occupational Health & Safety
In the hierarchy of controls, the most effective measure is:
- A.Personal protective equipment for every worker
- B.Administrative controls such as signs
- C.Training only
- D.Elimination of the hazard
Show answer
Answer: D. Elimination of the hazard
Order: elimination, substitution, engineering controls, administrative controls, PPE.
-
Question 6 · Professional Scenarios
A client asks you to reduce the reinforcement in a slab below code minimum to save money. You should:
- A.Agree, because the client is paying for the work
- B.Refuse and explain the safety requirement
- C.Agree but keep it secret
- D.Leave the project without explanation
Show answer
Answer: B. Refuse and explain the safety requirement
Codes set minimum safety standards.
-
Question 7 · Engineering Project Management
The critical path in a project network is the:
- A.Longest path, setting the minimum duration
- B.Shortest path through the network of activities
- C.Path with the most activities
- D.Path with the most resources
Show answer
Answer: A. Longest path, setting the minimum duration
Delays on critical activities delay the whole project.
-
Question 8 · Engineering Economics
The net present value of a project is:
- A.The total of all undiscounted cash inflows
- B.Discounted inflows minus discounted outflows
- C.Profit after tax in year one
- D.The payback period
Show answer
Answer: B. Discounted inflows minus discounted outflows
A positive NPV adds value at the chosen discount rate.
-
Question 9 · Contracts & Procurement
FIDIC contracts are widely used for:
- A.Employment contracts for engineering staff
- B.International construction projects
- C.Land sales
- D.Insurance policies
Show answer
Answer: B. International construction projects
The Red Book is for construction designed by the employer.
-
Question 10 · Environment & Sustainability
An environmental impact assessment is carried out:
- A.After the project is completed and fully operating
- B.Only for projects in cities
- C.Only if the community complains
- D.Before approval, to predict and manage impacts
Show answer
Answer: D. Before approval, to predict and manage impacts
Ghana's EPA issues environmental permits after assessment.
-
Question 11 · Engineering Law & Communication
To succeed in a negligence claim against an engineer, the claimant must show a duty of care, breach of that duty and:
- A.That the engineer was paid for the work
- B.A written contract
- C.Damage caused by the breach
- D.That the engineer is registered
Show answer
Answer: C. Damage caused by the breach
All three elements must be proved.
-
Question 12 · Asset Management & Maintenance
Preventive maintenance is carried out:
- A.Only after equipment has completely broken down
- B.Never on critical equipment
- C.At planned intervals to reduce the chance of failure
- D.Only by the manufacturer
Show answer
Answer: C. At planned intervals to reduce the chance of failure
Corrective maintenance follows failure.
Sample flashcards
Quick facts to revise. Members can study every card with Learn, Test and Match modes.
- Paramount duty
- Public safety, health and welfare
- Risk responses
- Avoid, transfer, mitigate, accept
- PDCA
- Plan, Do, Check, Act
- Engineering regulator
- Engineering Council (Act 819, 2011)
- Hierarchy of controls
- Eliminate → substitute → engineering → administrative → PPE
- Below-code request
- Refuse and explain
- Critical path
- Longest path, zero float
- NPV
- Discounted inflows − outflows
Ready to practise the full Engineering question bank?
Free account. Practise by topic, sit timed mock exams, study flashcards and track your readiness.
Create a free accountStudyVib is an independent study platform and is not affiliated with or endorsed by the Engineering Council, Ghana. Questions are original practice material written to reflect the syllabus; they are not past examination papers.