StudyVib

Biomedical Engineering

Engineering Professional Examination — Biomedical Engineering

Professional registration examination for biomedical engineers, administered under the Engineering Council of Ghana via GhIE's Bio Engineering & Biomedical Engineering Division.

Practice questions
203
Flashcards
147
Topics
19
Mock exam
100 questions · 120 min · pass 50%

What the Engineering Professional Examination — Biomedical Engineering covers

Our questions are organised by subject and topic, following the exam syllabus.

Biomedical Engineering Practice

  • Medical-Device Maintenance 13 Qs · 7 cards
  • Risk Management & Quality Systems 11 Qs · 8 cards
  • Clinical Engineering Ethics 6 Qs · 4 cards
  • Health Technology Management in Ghana 10 Qs · 6 cards
  • Hospital Infrastructure & Utilities 8 Qs · 6 cards
  • Rehabilitation & Assistive Technology 12 Qs · 10 cards

Professional Engineering Practice

  • Ethics, Competence & Public Safety 13 Qs · 7 cards
  • Occupational Health & Safety 12 Qs · 9 cards
  • Risk & Project Controls 10 Qs · 7 cards
  • Engineering Economics 12 Qs · 8 cards
  • Professional Review & Quality 12 Qs · 9 cards

Biomedical Engineering Science

  • Electrical Safety in Healthcare 10 Qs · 8 cards
  • Physiological Measurement & Monitoring 12 Qs · 10 cards
  • Medical Imaging Equipment 12 Qs · 10 cards
  • Life Support & Therapeutic Devices 14 Qs · 10 cards
  • Sterilisation & Medical Gases 10 Qs · 8 cards
  • Biomaterials & Biomechanics 8 Qs · 6 cards
  • Biomedical Signals & Electronics 10 Qs · 8 cards
  • Laboratory & Diagnostic Equipment 8 Qs · 6 cards

Sample Biomedical Engineering practice questions

Try these 12 questions from different topics. Open "Show answer" to check yourself and read the explanation.

  1. Question 1 · Medical-Device Maintenance

    A life-support device has undergone corrective maintenance. What should occur before it returns to clinical service?

    1. A.Return it immediately without testing
    2. B.Remove its asset identification label
    3. C.Documented performance and safety inspection according to the maintenance procedure
    4. D.Ask the first patient to test it
    Show answer

    Answer: C. Documented performance and safety inspection according to the maintenance procedure

    Post-maintenance inspection verifies that the device operates correctly and is safe for patients and users.

  2. Question 2 · Risk Management & Quality Systems

    A device repeatedly fails in the same way during use. What is the safest engineering response?

    1. A.Reset it repeatedly and erase the history
    2. B.Keep using it until a serious injury occurs
    3. C.Change the reported failure code to normal
    4. D.Remove it from service, preserve records and investigate the recurring failure and controls
    Show answer

    Answer: D. Remove it from service, preserve records and investigate the recurring failure and controls

    Recurring failures require containment, traceability, root-cause work and effective corrective action.

  3. Question 3 · Clinical Engineering Ethics

    A biomedical engineer is asked to certify equipment outside their competence. What should they do?

    1. A.Decline certification and obtain review by a suitably competent professional
    2. B.Certify it to meet the deadline
    3. C.Copy another device certificate
    4. D.Approve it if the requester is senior
    Show answer

    Answer: A. Decline certification and obtain review by a suitably competent professional

    Professional competence and public safety take priority over schedule or organizational pressure.

  4. Question 4 · Health Technology Management in Ghana

    WHO guidance on medical equipment donations recommends that donated equipment should:

    1. A.Be accepted in all cases because it is free
    2. B.Be the oldest model available
    3. C.Have no warranty
    4. D.Meet needs and come with manuals and spares
    Show answer

    Answer: D. Meet needs and come with manuals and spares

    Many donated devices go unused for lack of parts or training.

  5. Question 5 · Hospital Infrastructure & Utilities

    Operating theatres are usually kept at:

    1. A.Negative pressure relative to corridors
    2. B.The same pressure as outdoors with open windows
    3. C.No ventilation
    4. D.Positive pressure relative to surrounding areas
    Show answer

    Answer: D. Positive pressure relative to surrounding areas

    Clean air flows out, reducing contamination of the surgical field.

  6. Question 6 · Rehabilitation & Assistive Technology

    A pressure-relieving wheelchair cushion mainly helps prevent:

    1. A.Hearing loss in wheelchair users
    2. B.Vision loss
    3. C.Hypertension
    4. D.Pressure ulcers
    Show answer

    Answer: D. Pressure ulcers

    Sustained pressure on bony areas damages tissue.

  7. Question 7 · Ethics, Competence & Public Safety

    The paramount duty of a professional engineer is to:

    1. A.Hold public safety, health and welfare paramount
    2. B.Maximise profit for the employer on every project
    3. C.Complete projects as quickly as possible
    4. D.Please the client at any cost
    Show answer

    Answer: A. Hold public safety, health and welfare paramount

    Public safety overrides commercial pressure.

  8. Question 8 · Occupational Health & Safety

    In the hierarchy of controls, the most effective measure is:

    1. A.Personal protective equipment for every worker
    2. B.Administrative controls such as signs
    3. C.Training only
    4. D.Elimination of the hazard
    Show answer

    Answer: D. Elimination of the hazard

    Order: elimination, substitution, engineering controls, administrative controls, PPE.

  9. Question 9 · Risk & Project Controls

    The four common responses to a negative project risk are avoid, transfer, mitigate and:

    1. A.Ignore it completely and hope it never happens
    2. B.Celebrate
    3. C.Accept
    4. D.Duplicate
    Show answer

    Answer: C. Accept

    Transfer includes insurance and contract allocation.

  10. Question 10 · Engineering Economics

    The net present value of a project is:

    1. A.The total of all undiscounted cash inflows
    2. B.Discounted inflows minus discounted outflows
    3. C.Profit after tax in year one
    4. D.The payback period
    Show answer

    Answer: B. Discounted inflows minus discounted outflows

    A positive NPV adds value at the chosen discount rate.

  11. Question 11 · Professional Review & Quality

    The PDCA cycle for continuous improvement stands for:

    1. A.Prepare, Design, Construct, Approve
    2. B.Price, Deliver, Collect, Audit
    3. C.Project, Document, Commission, Archive
    4. D.Plan, Do, Check, Act
    Show answer

    Answer: D. Plan, Do, Check, Act

    It is associated with W. Edwards Deming.

  12. Question 12 · Electrical Safety in Healthcare

    The international standard series for basic safety and essential performance of medical electrical equipment is:

    1. A.ISO 9001
    2. B.IEC 60601
    3. C.ISO 14001
    4. D.IEC 61131
    Show answer

    Answer: B. IEC 60601

    In-service safety testing is covered by IEC 62353.

Sample flashcards

Quick facts to revise. Members can study every card with Learn, Test and Match modes.

PPM intervals
Manufacturer guidance + risk
Device risk management
ISO 14971
Failed safety test
Do not release
Donations
Needs-based, with manuals, spares, training
Theatre pressure
Positive
Pressure cushion
Prevents pressure ulcers
Paramount duty
Public safety, health and welfare
Hierarchy of controls
Eliminate → substitute → engineering → administrative → PPE

Ready to practise the full Biomedical Engineering question bank?

Free account. Practise by topic, sit timed mock exams, study flashcards and track your readiness.

Create a free account

StudyVib is an independent study platform and is not affiliated with or endorsed by the Engineering Council, Ghana. Questions are original practice material written to reflect the syllabus; they are not past examination papers.